This project was to update an en suite adding a bath as well. We removed the old suite, wall tiles and flooring. We then first fixed new pipe work for shower, bath, toilet and basin. Plastered all walls and ceiling ready for new tiles. The floor was then tiled and new low level shower tray and bath fitted. New boxing was created to hide the soil pipe in the corner of the room and behind the toilet. All walls were completely tiled ready for second fixing. The shower enclosure, wall hung basin, toilet and towel rail were then fitted along with new spot lights and extractor fan. The clients were really happy with the finished product they have even booked us in to update there other bathroom and downstairs cloakroom.